ISSN 0130-3872 Scientific-technical journal OF OIL AND GAS WELLS ON LAND AND SEA published since 1993 October 2015 ¹ 10 12 issues per year
CONTENÒS |
|
DRILLING TECHNIQUE AND TECHNOLOGY |
|
|
|
Scherbakov A.V. Determination of place of additional wellbore drilling in a multilateral well (p. 18-23) |
|
|
|
|
DRILLING MUD |
|
|
EQUIPMENT AND TOOLS |
|
|
WELL COMPLETION |
|
|
Information on the articles (p. 43-47) |
|
ANNIVERSARY DATES |
|
Mashaevu Alexandru Efimovichu – 80 years! (p. 48-48) |
|
Information on the articles |
|
SCIENTIFIC-TECHNICAL ACHIEVEMENTS OF JSC «VNIIOENG» IN CONSTRUCTION OF OIL AND GAS WELLS (JSC «VNIIOENG» – 50 years) (p. 4)
Sergey Avanesovich Oganov
JSC «VNIIOENG» 14, bld. 2, Nametkin str., 117420, Moscow, Russian Federation
The article presents information about the contribution of the scientists and experts of JSC «VNIIOENG» in the organization and implementation of the latest achievements of science, engineering and technology of well construction. Participation in the development of Ashalchinsky natural bitumen field in the Republic of Tatarstan as well as research work in the field of development and implementation of the method of wells horizontal drilling in the RF coal producing industry to provide advance degasification of coal mines in order to prevent the sudden gas emission, to ensure security as well as to solve the problems of mines protection from water inflows are detailed.
Key words: achievements of the Institute; development of bitumen deposits; degassing of mines.
|
|
CONCEPTUAL GROUNDS OF DESIGNING SAFE DRILLING TECHNOLOGY ON THE BASIS OF SYSTEM RISKS MINIMIZATION (p. 10)
Samir Masudovich Mammadov
LLC «NewTechService» 31G, Shabolovka str., 115162, Moscow, Russian Federation, phone: +7(985)771-72-52, e-mail: smammadov@nt-serv.com
Yaroslav Vladimirovich Rukavitsyn
CJSC «Geospectre» 51-1-1, Vavilov str., 117296, Moscow, Russian Federation, phone: +7 (910) 426-79-84, e-mail: yaros3000@yandex.ru
Alexey Gennadievich Zhuravlev Federal Autonomous Establishment «State Expertise» 12/5, Furkasovsky pereulok, 101990, Moscow, Russian Federation, phone: +7(926) 218-28-26, e-mail: 30alex@mail.ru
Roman Nikolaevich Okishev
LLC «Gazpromgeologorazvedka» 70, Gertsen str., 625000, Tyumen, Tyumen region, Russian Federation, phone: (3452) 54-09-54, e-mail: r.okishev@ggr.gasprom.ru
Methodical grounds of safe drilling designing in difficult technical-geological conditions, such as drilling of deep wells in complicatedly-built geological section, drilling of wells on the continental shelf and in the sea, drilling of directional and horizontal wells, and others are presented in the article. Technological schemes of drilling works designing to increase drilling efficiency and safety both in case of a wellbore mechanical deepening and opening of hydrocarbons productive layers due to control over system risks minimization are discussed.
Key words: designing of drilling works; drilling safety; risks minimization; mechanical speed of deepening; opening of productive layers.
|
|
DETERMINATION OF PLACE OF ADDITIONAL WELLBORE DRILLING IN A MULTILATERAL WELL (p. 18)
Andrey Valerievich Scherbakov
«KogalymNIPIneft», an affiliate of LLC «LUKoil–Engineering» in Tyumen 15, Druzhba Narodov str., 628485, Kogalym, Tyumen region, Russian Federation, phone: 8 (34667) 65301, e-mail: scherbakovav@nipi.ws.lukoil.com
Experience obtained during construction of ¹ 4548G multilateral well of Kogalym field performed by the joint fourth level of TAML classification proved the necessity of a detailed study of a well profile at the design stage. The article proposes some method of construction of a multilateral directional well profile to reduce the risks of possible complications in the intervals of clay-argillaceous rocks due to determination of the location of additional wellbore (lateral wellbore) drilling. Calculation results made it possible to conclude that this methodology of profile designing of a a multilateral directional well, allows distributing the risks between the main and lateral wellbores, downward to the lateral wellbore decrease. Thereby it is possible to solve the problem of risk reduction of insufficient running of a lateral wellbore liner without any additional material costs. Three multilateral directional wells were subject to field testing.
Key words: LLC «LUKoil–Engineering»; «KogalymNIPIneft»; directional wells; multilateral wells; well profile; lateral wellbore; TAML.
|
|
DEFINITION OF PACKERS’ OPERATIONAL CHARACTERISTIC WHEN APPLYING DIFFERENT TECHNIQUES OF OIL STRATA DEVELOPMENT (p. 23)
Nigar Anver Mikailova
State Oil Academy of Azerbaijan Republic 20, Azadlyg prosp., AZ1010, Baku, Republic of Azerbaijan, phone: (+994) 012-493-28-46, e-mail: mikailova_nigar@mail.ru
The article considers packers’ operational parameters used for oil layers’ development by applying the technology of hydrostatic mud pulses generation and application. Some method of packers’ operational parameters calculation, used when washing wells for development, is suggested. Well head pressure during fluid (water) injection of into a layer is defined. The value of overpressure is fixed as well. It is proved that the necessary condition when using packers for the fluid pumping into the layer is reliable and high-quality cementing of production casing strings. The proper choice of a sealing packer’s hermetical diameter allows effective restoration of the oil layer permeability. Physical phenomena while using packers require consideration of the energy system, oil layer being in static equilibrium before pumping out and hydrostatic fluid column, filling the well potential energy of which is converted by means of the pump, connected to the packer, into kinetic energy and then into the shock pulse energy. Energy balance equation is built. Its salvation provides getting some dynamic force that pays influence through the packer’s seal on the oil layer from the top down.
Key words: packer; rubber seals; overpressure; tearing force; coefficient of a cover; acting dynamic forces paying influence on the packer; hydrodynamic pulse.
|
|
DEVELOPMENT OF SOME METHODOLOGY APPLIED FOR PREPARATION OF CLAY-SILICEOUS ROCKS SAMPLES WITH ACCOUNT OF HETEROGENEITY AND UNCERTAINTY FACTORS (p. 25)
Tatos Vladimirovich Arutyunov, Olga Vadimovna Savenok, Alexey Timofeevich Koshelev
Kuban State Technological University 2, Moskovskaya str., 350072, Krasnodar, Russian Federation, phone/fax: 8 (861)233-18-45, phone: 8-918-474-49-84, 8-918-32-66-100, 8-988-246-76-71, e-mail: arutyunov-tatos@mail.ru, olgasavenok@mail.ru, KubGTU-INGE@yandex.ru
The article considers factors of methodical heterogeneity, uncertainty and fuzziness of shale rocks. Some methodology to be applied for preparation of artificial samples of clay-siliceous shale rocks is developed. The results of studies of artificial samples properties are presented.
Key words: clay-siliceous rocks; heterogeneity and uncertainty factors; coefficient of variation; properties of soil materials; intermediate solid-liquid phase; artificial sample; simulation of rock water-flooding conditions.
|
|
SOME ASPECTS REFERRING TO THE QUALITY OF FORMATIONS PENETRATION IN CONDITIONS OF THE EASTERN SIBE RIA (p. 28)
Olga Alexandrovna Lushpeeva, Leonard Mikhailovich Kochetkov
Tyumen State Oil and Gas University, a branch in the city of Surgut 38, Entuziastov str., 628400, Surgut, Tyumen region, Russian Federation, phone: (3462) 35-64-45, e-mail: Lushpeev035@gmail.com
Sergey Nikolaevich Bastrikov
JSC «SibNIINP» 118, 50 let October str., 625013, Tyumen, Russian Federation, phone: (3452) 32-21-69, e-mail: sibniinp@sibniinp.ru
The article analyzes the problems of formations penetration at the fields of the Sakha Republic (Yakutia). Some techniques of improving of primary penetration quality by choosing of a well rational design and optimizing of a drilling fluid composition are proved. To penetrate the productive deposits of Osinskiy productive horizon it is proposed to use invert emulsion solutions obtained by transformation of highly-mineralized biopolymer solutions. Cores’ permeability restoration factor when using emulsion solutions is higher than of those ones based on water solutions and reaches 85…90 %.
Key words: well; drilling; drilling mud; formations penetration; invert solution; emulsion solution; mineralized solution; complications during drilling; permeability restoration coefficient.
|
|
DEVELOPMENT OF BUFFER FLUID TO IMPROVE THE CEMENTING QUALITY OF WELLS DRILLED WITH OIL-BASED SOLUTIONS APPLICATION (p. 32)
Daniyar Lyabipovich Bakirov, Vitaly Alexandrovich Burdyga, Eduard Valerievich Babushkin, Natalia Vasilievna Voronkova, Alena Vadimovna Chudnovskaya, Alexander Vasilievich Melekhov
«KogalymNIPIneft», a branch of LLC «LUKoil–Engineering» in Tyumen 143a, Respublika str., 625026, Tyumen, Russian Federation, phone: (3452)545-170, 545-374, 545-446, 401-452, 401-938, 401-723, e-mail: BakirovDL@tmn.lukoil.com, BurdygaVA@tmn.lukoil.com, BabushkinEV@tmn.lukoil.com, VoronkovaNV@tmn.lukoil.com, ChudnovskayaAV2@tmn.lukoil.com, MelehovAV@tmn.lukoil.com
The article proposes some buffer liquid formulation buffer that will allow perfecting the cement stone adhesion with a casing string when using the oil-based solutions.
Key words: adhesion; washing ability; oil-based solutions (OBS); buffer liquid.
|
|
SOME PROBLEMS OF CAVITATION EFFECTS DURING OPERATION OF HYDRAULIC ACTUATORS OF MACHINE-BUILDING EQUIPMENT OF DIFFERENT DIRECTIONS, MANUFACTURING AND OPERATIONAL TECHNIQUES (p. 36)
Alexander Vasilievich Mineev, Anna Sergeevna Kaverzina
Institute of Oil and Gas, «Siberian Federal University» 82, bld. 6, Svobodniy prosp., 660041, Krasnoyarsk, Russian Federation, phone: 8 (391) 206-28-95, e-mail: kas_05@mail.ru
Alexander Alexandrovich Timko
Siberian Service Company 20, bld. 4, Svetlogorsky pereulok, 660125, Krasnoyarsk, Russian Federation, phone: (391) 278-87-90, e-mail: info@kf.sibserv.com
The article discusses the effect of cavitation during operation of the hydraulic actuators of the machine-building equipment of different directions, manufacturing technologies and operating techniques. The main functional parameters during the hydraulic actuators operation, affecting their reliability and durability, the causes of cavitation occurrence and the ways of cavitation prevention in a pump are determined. Key words: suction hole; drain line; vacuum-metric ways of opening.
|
|
SOME METHOD OF CALCULATION OF THE BALL FALL IN THE TRANSPORT COLUMN DURING CEMENTING OF LINERS AND DRILL-PIPE CASING STRINGS RUN DOWN SECTION BY SECTION (p. 38)
Dmitry Fedorovich Novokhatsky, Alexander Viktorovich Baev, Yury Vyacheslavovich Grinko
LLC «Kreplenie-Servis» 90, ap. 36, Vostochno-Kruglikovskaya str., 350059, Krasnodar, Krasnodar region, Russian Federation, phone/fax: (861) 211-51-74, e-mail: kreplenie-servis@mail.ru
Sultanbek Shirvanovich Larsanov
LLC «RN-Burenie», branch in Grozny 320, Ugolnaya str., 364052, Grozny, the Chechen Republic, Russian Federation, phone: 8(495) 730-02-45
The article is devoted to suspension devices that are used in deep wells to cement liners and casing strings run down section by section the construction of which envisages usage for opening of circulation windows of control balls discharged into the transport drill-pipe casing string. The article discusses different calculation methods of the ball’s fall (flight) in the transport line, including the method traditionally used in Grozny branch of LLC «RN-Burenie», E.G. Leonov and V.I. Isaev method, based on application of empirical dependences of the ball falling velocity on the transport line parameters and the displacement fluid and the method of calculation based on the experimental measurement of the ball falling time through the transport line as well as the problem of preventing of the ball untimely landing on the suspension device seat that can cause accumulation of the non-fully used grout in the drill-pipe casing string and the non-fully lifting of grout in the annulus up to the suspension device. The article compares the results of the calculations performed by applying different methods on the example of cementing of 219×245 mm bottom section of the intermediate casing string at one of the wells of Grozny branch of LLC «RN-Burenie» as well as presents practical recommendations on the application of the methods considered.
Key words: liner; sectional running down of casing strings; liners cementing; suspension device; transport line; controlling ball; fall of the ball in a moving fluid; ball falling in the fluid in space-limited conditions.
|
|
MASHAEVU ALEXANDRU EFIMOVICHU– 80 YEARS! (p. 48)
|
|
JSC "ALL-RUSSIAN SCIENTIFIC-RESEARCH INSTITUTE OF ORGANIZATION, MANAGEMENT AND ECONOMICS OF OIL AND GAS INDUSTRY" |