Safarov Ya.I., Ismailov E.T. A method of the stuck drilling tool release (p. 4-5) |
|
|
EQUIPMENT AND TOOLS |
|
|
|
|
WELL COMPLETION |
|
|
|
OIL FIELDS DEVELOPMENT |
|
|
|
|
|
REPAIR-INSULATION WORKS |
|
|
Information on the articles (p. 46-51) |
|
Information on the articles |
|
A METHOD OF THE STUCK DRILLING TOOL RELEASE (p. 4)
Yagub Ismail Safarov, Elshan Tofig Ismailov
Azerbaijan State University of Oil and Industry 20, Azadlig prosp., Az1010, Baku, Republic of Azerbaijan, e-mail: yaqub-safarov@mail.ru
The article attempts to determine the static and dynamic deformations of rocks in case of the stuck tools’ reciprocating movement, taking into account such basic contact factors as the contact temperature, the friction force, the contact pressure, the mechanical properties and geometric dimensions of the bodies in contact. It is assumed that the surface of one of them is an elastic layer (permeable rock), and the second one – the rigid body (drill pipe) that is pressed against the elastic one by some normal force. Based on the theoretical studies, obtained by the calculation formulas, the dependence of the deformation on the friction coefficient with account of the contact pressure, the rocks mechanical properties, the contact temperature and the geometrical dimensions of the elastic body are determined.
Keywords: sticking; pressure drop; drilling fluid; drilling tool.
|
|
TENSION OF PRODUCTION CASING STRINGS IN STEAM INJECTION WELLS (p. 5)
Vladimir Timofeevich Lukyanov, Vladimir Andreevich Vasiliev, Tatiana Alexandrovna Gunkina
The North-Caucasus Federal University phone: 8 (918) 937-08-60, 8 (918) 863-02-62, 8 (903) 413-79-81, e-mail: Lukianov50@mail.ru, rangm26@yandex.ru, Tatiana.stavr@yandex.ru
Vladimir Yurievich Bliznyukov
The article draws attention to the important aspects of the pre-tensioning technology of production casing strings in steam injection wells to prevent violation of their integrity. Presents The real data on the steam injection wells are presented, their analysis is conducted and propose an algorithm of calculations and measures of casing strings tension with account of the conductor settlement.
Keywords: steam injection well; tension of production casing strings; conductor’s real settlement; support reliability.
|
|
ANALYSIS OF MANUFACTURING TECHNOLOGIES OF REINFORCED CUTTING STRUCTURES OF ROLLER CONE DRILL BITS (p. 8)
Dmitry Yurievich Serikov
Gubkin Russian State University of Oil and Gas (National Research University) 65, Leninsky prosp., 119991, Moscow, Russian Federation, phone/fax: (915) 372-77-79 (Serikov D.Yu.), e-mail: serrico@rambler.ru
The article presents an analysis of manufacturing of steel reinforced cutting structures of roller cone drill bits.
Keywords: roller cone drill bit; toothed cutting structures; reinforcement; manufacturing technology.
|
|
ANALYSIS OF THE PROCESS OF DESTRUCTION OF SLIDING BEARINGS OF ROLLER CONE DRILL BITS (p. 15)
Nikolay Ivanovich Serdyuk
The Russian Geological Society 10, 2nd Roshchinskaya str., 115191, Moscow, Russian Federation, e-mail: kafedra_tkon@mail.ru
Oleg Gennadievich Blinkov
The Ural Federal University named after B.N. Yeltsin, the first President of Russia 19, Mir str., Yekaterinburg, 620002, Sverdlovsk reg., Russian Federation, phone/fax: (912) 241-12-79 (Blinkov O.G.), e-mail: blinkovog@gmail.com
The article analyzes the processes of the sliding bearings destruction of roller cone drill bit. The conducted researches allowed to identify the main causes of the sliding bearings destruction of roller cone drill bits as well as to trace the dynamics of the process of their basic elements destruction.
Keywords: roller cone drill bit; sliding bearing; support unit.
|
|
UPDATING OF LUBRICANTS AND PACKING DEVICES OF ROLLING-CUTTER DRILL BIT SUPPORTS (p. 17)
Oleg Gennadievich Blinkov
The Ural Federal University named after B.N. Yeltsin, the first President of Russia 19, Mir str., 620002, Yekaterinburg, Sverdlovsk reg., Russian Federation, phone/fax: (912) 241-12-79 (Blinkov O.G.), e-mail: blinkovog@gmail.com
Nikolay Ivanovich Serdyuk
The Russian Geological Society 10, 2nd Roshchinskaya str., 115191, Moscow, Russian Federation, e-mail: kafedra_tkon@mail.ru
The article presents the results of the studies aimed at updating of lubrication and sealing devices of rolling-cutter drill bit supports. Based on the analysis of the existing patterns and constructions of lubrication systems, used when manufacturing the serial drilling tools, new construction of lubricant and sealing devices were developed Use in practice proposed constructive solutions in view of lubricating and sealing devices will allow, firstly, to improve the reliability and durability of both the sealing system and bearing assemblies in the whole, and, secondly, to simplify their constructions as compared with the existing serial analogues, thus reducing the cost of the drilling tool manufacture.
Keywords: rolling-cutter drill bit; sealed support; sealing element.
|
|
THE EFFECT OF VOLUME CHANGES OF GROUTING MORTARS-STONES ON THE QUALITY OF CASING STRINGS PRIMARY CEMENTING IN WELLS (p. 19)
Natalia Vladimirovna Samsonenko, Sergey Liparitovich Simonyants
Gubkin Russian State University of Oil and Gas (National Research University) e-mail: ssturbo@mail.ru
Alexander Vladimirovich Samsonenko
LLC «Binder-Service» e-mail: speccem@rambler.ru
Use of chemically treated addition-free Portland cement slurries and grouting mortars based on barite, sand, etc. as weighting additives to addition-free cement mixes as well as microspheres, clay powder, rubber, marble crumbs et al as facilitating additives to addition-free cement mixes for primary cementing of different casings strings gives rise to the above-mentioned complications of the cementing process and the early water-flooding of wells. Contraction of Portland cement and grouting mortars-stones, that steadily increase in time and with temperature rise, reach 5–7 % or more, and this fact contributes to the formation of large pressure drops along the wellbore and the appearance of a variety of complications, leading, in some cases, to emissions and open flows. The developed powder-like expanding grouting mixture forms aerated and constant density grouting mixtures during the hydration process and grouting stones with a large volume expansion during the hydration hardening.
Keywords: cementing of casing strings; complications that arise during cementing of casing strings; grouting mortar; expanding grouting mixtures.
|
|
CONTRACTIONAL PRESSURE DROP AND POSSIBILITIES OF ITS COMPENSATION WHILE PORTLAND CEMENT HARDENING (p. 25)
Ivan Ilich Beley
LLC TyumenNIIgiprogaz 2, Vorovsky str., 625019, Tyumen, Russian Federation, phone/fax: (3452) 27-39-41, e-mail: Beley@tngg.ru
The article presents the research results of contractional pressure drop as compared to the cement stone strength while hardening of Portland cement slurries with oxide expansion agent. The methods of contraction compensation and vacuum development by using mineral or gas generating agents are considered. Possibility of receiving low contraction systems due to the pore pressure increase in the slurry/rock by the gas generating agent is determined. Their potential for casing strings cementing is shown.
Keywords: contraction; pressure drop; hardening; portland cement slurry; gas generating agent.
|
|
SUBSTANTIATION OF THE WAVE TECHNOLOGY POTENTIAL WHEN EXTRACTING HYDROCARBONS FROM THE BLOCKED ZONES OF FORMATIONS-RESERVOIRS (p. 29)
Artur Edvardovich Manasyan
JSC «Samaraneftegaz»
Roman Yurievich Kuznetsov
«Gazprom IP International», a branch in Saint Petersburg
Danir Rizifovich Sultanov
Scientific Center of Non-Linear Wave Mechanics and Technology, Russian Academy of Sciences 4, Bardin str., 119334, Moscow, Russian Federation, phone: +7 (499) 135-55-35, e-mail: info@nwmtc.ac.ru
This article discusses the possibility of wave technologies application developed in Scientific Center of Non-Linear Wave Mechanics and Technology, RAS, under the supervision of academician R.F. Ganiev, to recover oil and gas from the blocked zones of formations-reservoirs. This fact leads to consideration of the problem of wave penetration depth into the saturated porous medium of a formation. It is important when studying some specific features of physical processes occurring in a rock under the influence of the wave field.
Keywords: wave technologies; productive formation; wave field; wave influence.
|
|
REDUCTION OF THE RISK OF EMERGENCY OCCURRENCE CAUSED BY SOME MECHANICAL DAMAGE PROTECTIVE INSULATION COATING OF PIPELINE (p. 31)
Alexander Fedorovich Maximenko, Alexander Anatolievich Vasiliev
Gubkin Russian State University of Oil and Gas (National Research University) 65, bld. 1, Leninsky prosp., 119991, Moscow, Russian Federation, phone: 8-916-323-78-39, e-mail: fafner_negodiy@mail.ru
The article deals with the risk reduction of an accident situation caused by mechanical damage of a pipeline insulation. Mechanical damage of the protective polymer insulating coating, being the risk factor of emergency occurrence, is considered as the main problem. The probability of a pipeline failure, followed by the losses caused by the emergency, which directly depends on the preservation of the protective coating continuity, is discussed as well.
Keywords: mechanical impact; protective coating continuity; risk of emergency occurrence; losses caused by the emergency; uninterrupted work; event tree construction.
|
|
FIELD EXPERIENCE OF A COMPLEX TECHNOLOGY IMPLEMENTATION TO INCREASE CURRENT OIL PRODUCTION (p. 34)
Artur Edvardovich Manasyan
JSC «Samaraneftegaz»
Yury Stepanovich Kuznetsov
Scientific Center of Non-Linear Wave Mechanics and Technology, Russian Academy of Sciences 4, Bardin str., 119334, Moscow, Russian Federation, phone: +7 (499) 135-55-35, e-mail: info@nwmtc.ac.ru
Azat Vasilovich Khusainov
LLC «Arm-Service»
The article shows that modern methods of a formation complex stimulation, based on the wave technologies and developed in the Scientific Center of Nonlinear wave mechanics and technology, RAS, headed by academician R.F. Ganiev, significantly improve the indicators of oil and gas fields development. Large-scale introduction of this technology can be an alternative to a formation hydraulic fracturing that will provide not only oil recovery enhancement, but also preservation of the subsoil assets in view of compliance with environmental requirements.
Keywords: wave technologies; wave field; reservoir properties; well bottom formation zone; filtration rate.
|
|
THE METHOD OF DETERMINING THE VALUE OF RADIATION HEAT FLOW DURING A MAIN GAS PIPELINE FIRE (p. 39)
Nikolay Denisovich Tskhadaya
Ukhta State Technical University 13, Pervomayskaya str., 169300, Ukhta, Republic of Komi, Russian Federation, phone/fax: 8 (8216) 77-44-02, e-mail: rektor@ugtu.net
Arkady Igorevich Bykov
LLC «Gazprom transgaz Ukhta» 39/2, Lenin prosp., 169300, Ukhta, Republic of Komi, Russian Federation, phone: 8 (8216) 77-20-24, fax: 8 (8216) 77-24-65, e-mail: abykov@sgp.gazprom.ru
It is shown that the magnitude of the radiation heat flow during a gas pipeline fire can be defined for scenarios S1 – a column type fire and S2 – a stream fire, with account of the adapted expressions of evaluation of the angular coefficient of radiation and absorption coefficient of thermal radiation under the known humidity of the atmospheric air at the point of the fire. The existing methods are cumbersome and overfilled with data, thus complicating their use in the engineering practice. This article is devoted to the method of calculation applied to determine the radiative heat flow values during the fire on the main gas pipeline.
Keywords: radiation heat flow; angular coefficient; coefficient of thermal radiation absorption.
|
|
THE RESULTS OF REPAIR-RENEWAL ACTIVITIES IN WELLS OF THE WESTERN SIBERIA FIELDS USING A COMPLEX TECHNOLOGY OF JSC «SEVKAVNIPIGAZ» (p. 42)
Ramiz Alievich Gasumov, Ilgam Yusif Shikhaliev, Irina Stanislavovna Shikhalieva, Yevgeny Alexandrovich Yarin, Irada Ilgam Iskanderova
JSC «SevKavNIPIgaz» 419, Lenin str., 355000, Stavropol, Russian Federation, phone: (8652) 56-30-26, 94-35-83, e-mail: Priemnaya@scnipigaz.ru, ShihalievIY@scnipigaz.ru, ShihalievaIS@scnipigaz.ru
The article considers the results of repair-renewal activities in gas wells of the Western Siberia fields carried out by using an efficient complex technology developed by JSC «SevKavNIPIgaz».
Keywords: process fluids; repair-renewal activities (RRA); repair-insulation works (RIW); workover of wells; bottom hole formation zone (BHFZ); gel-forming composition (GC); reservoir; water-flooding; gas-water contact; tubing.
|
|
JSC "ALL-RUSSIAN SCIENTIFIC-RESEARCH INSTITUTE OF ORGANIZATION, MANAGEMENT AND ECONOMICS OF OIL AND GAS INDUSTRY" |